Huawei(MTN), Zambia Fibre Project – New Build – R380 million
Huawei(TelOne), Zimbabwe Fibre Project – New Build – R58 million
AFCZ(iConnect), Zambia Metro Fibre Project – New Build – R60 million
Fibreco – Fibre Optical Cable Deployment – R400 million
Fibre Optical Cable Project – New Build – R280 million
Alcatel, Cape Town FTTH Project – New Build – R3 million
Mobile Telephone Networks Pty Limited: Metro FibreRoll-out, 48 Self-build sites – R35 million
Vumatel, Ekurhuleni & Villages Projects (250,000+ Home Passes) – Various Rolls
SA Digital Villages (130,000+ Home Passes) – Various Rolls
Isibindi Solutions (28,000+ Home Passes) – Operation Management
Kliptown Secondary School – Upgrade – R212 million
McBrain Charles Primary School – New Build – R188 million
Cavendish Primary School – Upgrade – R146 million
Lancea Vale Secondary School – Upgrade – R250 million
Riverlea Secondary School – Upgrade – R251 million
Rondebuilt Primary School – Upgrade – R185 million
Centurion High School – Upgrade – R175 million
EsselenPark Secondary School – Upgrade – R251 million
Gamble High School – Upgrade – R170 million
Potchefstroom School – Upgrade – R190 million
Gautrain Rapid Rail Link – Marlboro to OR Tambo & Fountains to Hatfield – R600 million
Bus Rapid Transport – Tshwane Line 1 Section 1 – R550 million
BRT – Tshwane Line 1 Section 1 (Separate Entry) – R300 million
Rehabilitation of N14 – Northwest Border to Kuruman – R280 million
N4 Link Road – R300 million
N1 – Glenlyon to Zandkraal – R80 million
N17 Rehabilitation – R320 million
Zithuleli Road – R580 million
Zastron Road – R130 million
Ugie Road – R380 million
Waterford Township Development – R380 million
Proclamation Hill Township Development – R180 million
Manhica – Inculuane, Maxunque & Ethiopia Road Works (Mozambique) – R400 million
Balfour Sewer Upgrade – R40 million
Glen Marais Ext 45 – R18 million
Waterkloof Ridge Infrastructure – R1.5 million
Westgate Shopping Centre – Renovation – R32 million
Madison Loft Springs – 13-Storey Renovation – R55 million
13 Baker Street – 5-Storey Structural Renovation – R38 million
COC Building – SANRAL Offices – Structural Works – R350 million
Hatfield Station Building – Gautrain Project – R680 million
Nestlé Building – R280 million
Residential Building – Hatfield – R110 million
Windfarm – Mossel Bay – R850 million
Mossel Bay Gas Windfarm Project – R1.2 billion
Scorpion Zinc Mine – Earthworks, Roads, and Tanks – R2.7 billion
Natref (National Refinery Project) – R100 million
Braamhoek – Eskom Infrastructure – R250 million
Waterkloof Airport – Development & Upgrades – R750 million
Bloemfontein Airport – Runway and Building Upgrades – R400 million
Upington Airport – Upgrades – R60 million
Polokwane International Airport – R32 million
Winburg Truck Stop – R15 million
Manonga Trust – 3-Storey, 2200m² – R7.5 million
Namibia Helipad House – 4-Storey Mountain Build – R28 million
CTM Witbank – R2 million
Brakpan Police Station – Infrastructure Upgrade – R28 million
Flavius Mareika Primary School – R4 million
Alexander Primary School – R3.8 million
East Bank School – R6 million
ITS DBOM (Intelligent Traffic Systems) – R900 million
Windfarm – Mossel Bay – R850 million
Mossel Bay Gas Windfarm Project – R1.2 billion
Braamhoek – Eskom Infrastructure – R250 million
Midstream, Silver Lakes, and Protea Estate, Electrical Reticulation
Gautrain (DD4 & DD7) Utility Relocations
SANRAL Cape Town Traffic Management Centre, Electrical Reticulation
SANRAL Johannesburg Road Agency, Electrical Reticulation and Project Management
KwamNyandu Shopping Mall (Durban) – New Build – R12.5 million
Modi Mall (Modimolle) – New Build – R4.2 million
Letlhabile Shopping Centre – New Build – R5.2 million
Mayfield Shopping Centre (Johannesburg) – New Build – R8.6 million
Heritage Square (Kathu) – New Build – R13.1 million
Zebediela Plaza – New Build – R3.8 million
Mandini Plaza – New Build – R4.1 million
Paledi Shopping Centre (Limpopo) – New Build – R6.1 million
Hazyview Junction – New Build – R14.8 million
Soshanguve Shopping Centre – New Build – R8.6 million
Groblersdal Shopping Centre – New Build – R16.8 million
Thulamahashe Shopping Centre – New Build – R12.3 million
SAA Domestic Lounge (Airports Company South Africa) – New Build – R2.1 million
Centre De La Vie Hospital (Mpumalanga) – New Build – R8 million
Royal Marang Hotel (Rustenburg) – New Build – R18.5 million
Clarck Road Clinic – New Build – R0.9 million
Laser Group Warehouse (Gauteng) – New Build – R12 million
Builders Warehouse (Secunda & Protea Glen) – New Build – R2.95 million
PnP Local Stores (42 Sites) – New Build – R0.6 million
PnP Mall of the South & Umtata – New Build – R6.2 million
Boxer Matatielle – New Build – R1.2 million
Food Lovers Market (Brooklyn) – New Build – R0.38 million
Lowveld Mall – New Build – R8.4 million
Kaalfontein Shopping Centre – New Build – R11.2 million
Rondebult Tiling Factory & Industrial Warehouses (Witbank, Emalahleni) - Mechanical Services Installations
Juanre Developers, Highveld (3 units) – R4.2 million
Ebotse Estate, Benoni (31 units) – R55 million
High-Density Developments, Rynfield X117 (112 units) – R35 million
Bradfort, Rynfield X49 (72 units) – R22 million
Various Lawrence Full & Sectional Title Developments – Centurion & Hartbeespoort (270 units) – R100 million
Explore Galore Housing Projects (Midstream & Centurion) – R118 million
Bela-Bela Township – 49 erven – R5.5 million
Lock & De Jager – Raslouw Manor, Centurion – 170 units – R18 million
Eldo Meadows & Eldoraigne X53 – 140 units – R15 million
Brakpan New Town Layout – 49 erven – R20 million
Theresapark X63, Acasia Gholfcource – 300 Units – R18.6 million
Hesteapark X18, Acasia Gholfcource – 296 Units - R15 million
Rondebult Coal Workshops & Offices, Witbank – R5.5 million
The Worx Warehouse , Witbank – R3 million
Rondebult Machinery, Bloemhof Branch – R6 million
Liugong Warehouse, Ekandustria – R3.2 million
Solly Kramers Warehouses Pretoria – R1.2 million
Coral Liquer Warehouse Centurion – R1.75 million
Moto City Maputo – R4 million
Supa Heat Geysers Production Warehouse Centurion – R1.9 million
Arbeid Adel Trusses Warehouse, Centurion – R4.6 million
Midway Plumbing Warehouse & Sales Headoffice – R8.6 million
Royal Elephant Boutique Hotel, Centurion – R35 million
Forever Resorts Hotel, Centurion – R55 million
Komatiepoort In-transito Lodge / Guesthouse – R5.5 million
Various Retail Parks and Medical Centres – Centurion, Laudium, Pretoria – R12 million
Lenasia X23, 24 & 25 – R110 million
Rietvalleirand X44 (70 Dwellings) – R88 million
Military Veterans Housing, Mandelabay (491 Units) – R225 million
Clarina X42, Retirement Village – R240 million
Amandasig X69, Entry Level Housing (218units Res 1) – R76 million
Aeroloft Hotel, 3 Star (184 Beds), Rhodesfield, Kempton Park – R280 million
Don Basco Township, Hwange, Zimbabwe. New Shopping Centre, Firestation, Church, Chreche & 240 New Houses – R720 million
Fairway Gardens Acasia Pretoria North – R80 million
Olievenhoutbosch Rezoning & Building 685 Units – R119 million
Nelspruit Student Housing (1008 Beds) – R64 million
Epupa Hydropower Project (4 dam sites) – Detailed geological mapping, rock mass assessment, slope stability evaluations
Mozambique Dam Projects (4 small dams) – Comprehensive geotechnical investigations
Libya Dam Sites (4 sites) – Foundation and materials investigations
Sasol Gas Pipeline (300 km, Secunda to Komatipoort) – River crossing stability studies
Gautrain Rapid Rail Link – Dolomite stability investigations for infrastructure
Omdel Dam, Namibia – Permeability and seismic refraction testing
N3 Highway (Heidelberg to Cedara) – Dolerite suitability for construction
Harding to Izingolweni Road (KZN) – Material suitability for road construction
Madagascar Slurry Pipeline (~200 km) – Detailed geological mapping and slope stability
Protea Glenn Town – ±6,500 stands
Soshanguve South Ext. 13 – ±1,500 stands
Kananapark Town – ±1,400 stands
Far East Bank Erf 488 – ±500 stands
Ekulendeni A Ext. 1 – ±400 stands
Elukwatini Ext. 1 – ±1,100 stands
Eden Park Ext. 5 – ±2,900 stands
Midstream Estate Ext. 1–59
Waterkloof Ridge Ext. 5 & 6
Eldoraigne Ext. 38, 39, 40, 42, 48
Sagewood (Proper, Ext. 2–4, 8)
Summerset (Proper, Ext. 1)
Barbeque Downs Ext. 15 & 38
Peach Tree Ext. 1–3
Brentwood Ext. 18
Sinoville Ext. 19, Die Hoewes Ext. 246
Rooihuiskraal Noord Ext. 25
Zondagsfontein AA – ±1,500 stands
Waterval – ±670 stands
Daveyton Ext. 12 – ±700 stands
Casa Blanca (Midrand) – 43 units
Glen Gardens (Edenvale) – 167 units
Willow Crest (Sagewood X13) – 287 units
Wonderpark Estate (Karenpark X24) – 1,480 units
Royal View (Roodepoort) – 130 units
Bel Aire (Vorna Valley X83) – 366 units
Clermont, Ellisras – 600 ha
Geluksfonten 643-LR, Vaalwater – 950 ha
Goedhoop, Barberton – Various sizes
Marcona, Bethlehem – 28 ha
Sasol 2 & 3 – Structure setting out
BMW SA – Paint and body plant with ≤1mm tolerance
Samancor – Crusher plant and factories
Matimba Power Station – Control & structure setting out
N4 highway & shorter roads – Road alignment
Gauteng main water pipeline – Alignment setting
Underground tunnels – General and control surveys
Structural Movement Monitoring – Sites: Sandton, JSE, ABSA, etc.
Contour & Detail Surveys – Up to 1,200 ha (e.g., Summerset, Bronkhorstbaai)
Existing Structure Surveys – For civil and architectural planning
Pile Position Surveys – Including as-built pile verification
Mine Surveys – Control and layout for surface and plants
Coastal & Utility Surveys:
Natal Coast – With SA Navy
Power line survey – Ellisras to Botswana
Altitude network via GPS and levelling
Boitekong X1–X3, Rustenburg – ±7,600 stands
Cashan X3, Rustenburg – ±320 stands
Dinwiddie X8 & X9, Germiston – ±400 stands
Eldoraigne X25, X28, X35, X38, X39, X40, X42 – ±700 stands
Geluksdal, Brakpan – ±1,100 stands
Gholfrifrand, Midrand – ±600 stands
Bela-Bela, Warmbaths – ±400 stands
Don Bosco Township, Hwange, Zimbabwe – 240 houses, shopping centre, church, clinic, fire station
Highveld, Centurion (multiple extensions)
Raslouw Manor, Centurion (170 units)
Olievenhoutbosch (rezoning and 685 buildings)
Kenleaf X23 & X30, Brakpan (262 units)
Theresapark X63, Acasia Golf Course (300 units)
Hesteapark X18, Acasia Golf Course (296 units)
Eldo Meadows, Centurion (140 units)
Neethlings Place, Warmbaths (17 units)
Bela-Bela Guide Plan (1993)
Boksburg Structure Plan (1986)
Ellisras Guide Plan (1991)
Hartbeespoort Master & Structure Plans (1994 & 1997)
Damdoryn Development Plan (2000)
Majakeneng Structure Plan (1997)
Fountains Valley Development Plan (1994)
Witwatersberg Conservation Policy (2000)
Fairway Gardens, Pretoria North – Urban development
Rietvalleirand X44 – 70 dwellings
Clarina X42 – Retirement village (±240m)
Brentwoodpark, Benoni – ±82 units
Amandasig X69 – 218 Entry-level houses
Soweto – 48 Res2 units
Kenleaf, Brakpan – 142 & 120 units
Nelspruit Sonheuwel – 76 units
Brits X72 – 162 & 58 units
Bloemhof – 24 Retirement units
Bondev Development (Pty) Ltd.
Centurion Town Council
Denel Properties
Eskom
Hartbeespoort Local Council
Lonmin Platinum
Rand Consolidated Properties
Rustenburg City & District Council
Gauteng Department of Housing
Various SANRAL Road Projects – R501, R524, R578
N2 Piet Retief Ring Road
Upgrading of Monument Road & Trichardts Road – Traffic studies
Ormonde Road Link – Traffic Impact Study
Nancefield Precinct Plan
Atteridgeville, Mabopane & Midrand Road Master Plans
Aspen Hills X7 – 612 units + 8,800 m² retail
Slovo Park (Nancefield X5) – 1,440 units + 12,000 m² retail
Impumelelo – 1,800 units + 3,600 m² retail
Minnebron X1 – 11,401 units + 30,000 m² business
Dalpark X18 – 5,314 units + 3,000 m² business
Leachville X2 – 1,180 units
Mackenzi Park X3 – 9,200 units
Stinkwater – 1,350 units + 7,000 m² retail
Magalies 19 – 1,632 units
Ga-Rankuwa 9 – 1,758 units
Montecasino Boulevard Townships – 100,000 m² business + 1,500 units
Zandspruit Intermodal Facility – Transport input
Zone of Choice Development Frameworks – Various locations
Baralink, Swazi Inn, Mamelo Housing Project, Tswelapele – Transport inputs
Public Transport Masterplan – Midrand, Vosloorus, Marabastad, Tswelapele
Hoedspruit Ethanol Plants – R1 billion
Craddock Ethanol Plants – R800 million
Delmas Cement Manufacturing – R2 billion
Taxi holding areas and rank developments in Midrand and Germiston
Bazaar Street Taxi Rank
Ikageng Bus Terminus, Mamelodi
Proton Road Taxi Rank
Elandsfontein West Taxi Rank
Midrand Mini-Taxi Ranks & Church Street Rank
Halfway House Taxi Rank – Ablution upgrade
Rabie Ridge Taxi Rank
Shopping centres, residential estates, schools – Numerous studies
Access to Ultra Liquors (Bramley), SAPO – Johannesburg Airport
Lewende Woord Centurion – Access & TIA
Doxa Deo School – Parking & access
City of Johannesburg, Tshwane, and Ekurhuleni Metros – Extensive collaboration
Department of Public Works – Traffic inputs for clinics and facilities
Project management of access roads and stormwater canals – e.g., Matenteng, Nuwe Eersterust, Majaneng
Thohoyandou High Court – Dept of Public Works – R10 million
Sibasa SAPS Head Office – Dept of Public Works – R20 million
Northam Info Hub & Co-location – Anglo American – R13 million
Lebombo Housing Development – Nova Property Group – R34 million
Black Rock Clinic & Admin Offices – Assmang Manganese – R34 + R66 million
Black Rock Nchwaneng Change House – Assmang Manganese – R90 million
Atterbury Décor Retail Centre – K. Carrim – R64 million
Savana Shopping Centre, Pietersburg – R60 million
Lebowakgomo Hospital Phase 3, Limpopo – R30 million
PWD Projects (Schools, Clinics, Welfare offices) – Limpopo – R300 million cumulative
Piet Retief Hospital – R100 million
Waterkloof Golf Estate Residential – R60 million
Customer Care Centres, Gauteng – R170 million
SA Chancery & Residences, Malawi – R87 million
Revamp of Transoranje School for the Deaf – R113 million
Pinnacle College, Kyalami – R101 million
Garankuwa Nursing College – R92 million
Benoni Shopping Centre Revamp – R80 million
BP Service Stations – Gauteng – Accumulated R250 million
BP Technology Lab & Offices, Kyalami – R20 million
BP Refresh Project – R8 million
BP PnP Conversions – R30 million
Matsepe Primary School, Limpopo – R34 million
Itereleng & Sekabate Primary Schools, Limpopo – R45 million combined
Ramotshodi Secondary School, North West – R18 million
Southdowns College (Main & Additions) – R33 million combined
LSEN Schools Upgrade (Gauteng Special Needs) – 11 schools – Various values
Various Clinics – NW Province – R10 million
Sefikile & Seraleng Clinics, North West – R39 million combined
Suidrand Step Down Centre (80 beds), Kroonstad – R26 million
Mahindra & McCathy Showrooms, Piet Retief – R16 million combined
Mantsere Clothing Factory, NW – R5 million
Driefontein Quarry, Gauteng – R150 million
SANCORP 38 Warehouse, Gauteng – R3 million
Kuruman Mall & Artisan College – R78 million combined
Centre De La Vie Hospital, Mpumalanga – R8 million
Lynnridge Mall Upgrade – R10 million
Mid-Med Hospital, Mpumalanga – R2 million
Lusikisiki Plaza, Eastern Cape – R3.9 million
Wingtip Crossing, Pretoria – R3.4 million
Matatiele Mall – Various Line Shops – R1.8 million
Builders Warehouse (Secunda & Protea Glen) – R2.3m & R0.65m
Sasolburg Junction – R4.6 million
Lowveld Mall, Nelspruit – R8.4 million
Kaalfontein Shopping Centre – R11.2 million
Soshanguve Shopping Centre – R8.6 million
Groblersdal Shopping Centre – R16.8 million
Thulamahashe Shopping Centre – R12.3 million
Royal Elephant Boutique Hotel, Centurion – R35 million
Forever Resorts Centurion Hotel – R55 million
Komatiepoort In-Transit Lodge / Guesthouse – R5.5 million
Doddieburn Ranch River Lodge, Zimbabwe – R3.6 million
Lidikwe Game Lodge & Conference Centre, Warmbaths – R4 million
Lydenburg Guesthouse (24 Beds) – R8.5 million
Aeroloft Hotel (184 Beds), Kempton Park – R280 million
Clarina X42 Retirement Village – R240 million
Olievenhoutbosch – 685 units (Rezoning & Building) – R119 million
Kenleaf X30 & X23, Brakpan – R110 million
Amandasig X69 (218 units) – R76 million
Brits X72 (220 units) – R66 million
Bloemhof Retirement (24 Units) – R8.4 million
Military Veterans Housing, Mandelabay (491 Units) – R225 million
Explore Galore Housing Projects – Midrand & Centurion – R96 million
Suidrand Step Down Centre (80-bed), Kroonstad – R26 million
Clarck Road Clinic – R0.9 million
Garankuwa Nursing College – R92 million
Transoranje School for the Deaf Revamp – R113 million
Zandspruit Intermodal Facility – Transport planning input
Bazaar Street Taxi Rank – Design & implementation
Ikageng Bus Terminus, Mamelodi – Design & site supervision
Matenteng Stormwater Canal – Project management
Nuwe Eersterust Access Road – Project management
Majaneng Access Road – Project management
Kopanong Link Roads & Collector Roads, Soshanguve – Project management
11th Road, Winterveld – Project management
Huawei(MTN), Zambia Fibre Project – New Build – R380 million
Huawei(TelOne), Zimbabwe Fibre Project – New Build – R58 million
AFCZ(iConnect), Zambia Metro Fibre Project – New Build – R60 million
Fibreco – Fibre Optical Cable Deployment – R400 million
Fibre Optical Cable Project – New Build – R280 million
Alcatel, Cape Town FTTH Project – New Build – R3 million
Mobile Telephone Networks Pty Limited: Metro FibreRoll-out, 48 Self-build sites – R35 million